Next Investors logo grey

Drill rig mobilised on site at the Merlin-2 appraisal well

|

Published 01-MAR-2022 12:52 P.M.

|

53.4 seconds read


On Tuesday, 88E announced that the mobilisation of the Arctic Fox drill rig had been completed ahead of the Merlin-2 appraisal well’s anticipated spud date next week.

The Merlin-2 appraisal well is fully permitted to a total depth of ~8,000 feet which 88E expects will take ~4-5 weeks.

88E also confirmed it would have production testing equipment on stand-by should the drilling program successfully intercept oil paying zones.

With drilling now only ~1 week away, our recent update note is worth reading as it sets the scene for what Merlin-2 could mean for 88E and our expectations from the drilling program.

We think success with the Merlin-2 appraisal well would look something like:

  1. Net oil paying zones (Thickness) across the three reservoirs >41 feet (this is the reservoir thickness intercepted in the Merlin-1 well - so we want to see the same or better).
  2. Drilling program is successful enough to warrant production testing.
  3. Production tests confirm light oil and high flow rates.

One or all of the above is what we would like to see from the Merlin-2 drilling, and that would deem Merlin-2 a success.