Elixir targeting 13 new wells in 2021
Hey! Looks like you have stumbled on the section of our website where we have archived articles from our old business model.
In 2019 the original founding team returned to run Next Investors, we changed our business model to only write about stocks we carefully research and are invested in for the long term.
The below articles were written under our previous business model. We have kept these articles online here for your reference.
Our new mission is to build a high performing ASX micro cap investment portfolio and share our research, analysis and investment strategy with our readers.
Click Here to View Latest Articles
In January, we reported that colder weather in large LNG importing nations, combined with outages at major production hubs and congestion along global shipping routes had pushed spot prices for the commodity in Asia to the highest levels since 2014.
Natural gas prices have increased from US$2.58/MMBtu at the start of the year to nearly US$3.00 last week, and the March Nymex contract was up 5.7 cents to US$2.92/MMBtu on Friday.
Natural Gas Intel cited the anticipation of extremely cold weather conditions as the key reason for sustained strength in commodity prices.
Analysts at Wood Mackenzie said the frigid temperatures in the US are leading to “system strain” for natural gas pipeline operators across the country.
Amid this buoyant pricing environment, Elixir Energy (ASX:EXR) has released its work program for 2021 as it prepares to expand an already impressive resource in Mongolia where it has access to broader Asian markets.
The PSC as shown below covers approximately 30,000 square kilometres adjacent to the border with China, and with leaders openly stating that they are aiming to reduce emissions, the country could be a source of demand with Elixir’s sizeable acreage being a key attraction.
This is a snapshot of Elixir’s acreage, existing wells and proposed wells in relation to its 2021 program.

13 wells, 200 kilometres of seismic analysis and one pilot production test
Elixir is going to be extremely busy on the exploration front in 2021 as it aims to complete 13 wells, but it will also be performing some important production test work of the Nomgon sub-basin coal seams.
This will be the first test of its kind in Mongolia and it is designed to determine commerciality, fluid flow from the coal seam and the measurement of water and gas rates, while also providing some insight as to the water quality.
The test will begin in the second half of 2021, drawing on learnings from the Australian CBM industry where management has had significant success.
On the exploration front, Elixir has a wealth of options to choose from, having only drilled 1.4% of the 30,000 square kilometre licence.
The following provides an insight into the company’s proposed target areas in 2021.

Valuable data collected in 2020 to assist in exploration campaign
While management can draw on experience in other regions in terms of developing exploration strategies, there is still significant data that was collected in 2019/2020 that will assist in growing the group’s resource.
The integration of laboratory and desktop analysis of the well and seismic data acquired in 2019 and 2020 is an ongoing exercise.
The following timetable for 2021 outlines Elixir’s plans, including the staging of 13 wells between April and December.

To date Elixir has proved that the coals in the sub-basin have a thickness (vertical) of up to 90 metres and gas contents of up to 10 million cubic feet per tonne.
Data relating to permeability, gas saturations and methane content has also been encouraging.
Contingent resource increases by 7 trillion cubic feet
There was an impressive uptick in Elixir’s independently verified Prospective Resource (2U) with it increasing from 7.6 Tcf to 14.6 Tcf on a risked basis.
Elixir’s maiden contingent resource estimate will be focused solely on the Nomgon sub-basin with a view to supporting a local development project.
Technical analysis has identified seismic character that should be associated with coal, and this character has upgraded the prospectivity, prompting management to test the concept in 2021.
Building social license is vital for the resources business and Elixir will expand its programs in this area.
Management is currently investigating local carbon offset options for its Scope 1 and 2 emissions.
Elixir enters 2021 with cash of approximately $9 million which management expects will fully fund the work program as operations are very low cost and notably, exploring for CBM is capital efficient.
General Information Only
This material has been prepared by StocksDigital. StocksDigital is an authorised representative (CAR 000433913) of 62 Consulting Pty Limited (ABN 88 664 809 303) (AFSL 548573).
This material is general advice only and is not an offer for the purchase or sale of any financial product or service. The material is not intended to provide you with personal financial or tax advice and does not take into account your personal objectives, financial situation or needs. Although we believe that the material is correct, no warranty of accuracy, reliability or completeness is given, except for liability under statute which cannot be excluded. Please note that past performance may not be indicative of future performance and that no guarantee of performance, the return of capital or a particular rate of return is given by 62C, StocksDigital, any of their related body corporates or any other person. To the maximum extent possible, 62C, StocksDigital, their related body corporates or any other person do not accept any liability for any statement in this material.
Conflicts of Interest Notice
S3 and its associated entities may hold investments in companies featured in its articles, including through being paid in the securities of the companies we provide commentary on. We disclose the securities held in relation to a particular company that we provide commentary on. Refer to our Disclosure Policy for information on our self-imposed trading blackouts, hold conditions and de-risking (sell conditions) which seek to mitigate against any potential conflicts of interest.
Publication Notice and Disclaimer
The information contained in this article is current as at the publication date. At the time of publishing, the information contained in this article is based on sources which are available in the public domain that we consider to be reliable, and our own analysis of those sources. The views of the author may not reflect the views of the AFSL holder. Any decision by you to purchase securities in the companies featured in this article should be done so after you have sought your own independent professional advice regarding this information and made your own inquiries as to the validity of any information in this article.
Any forward-looking statements contained in this article are not guarantees or predictions of future performance, and involve known and unknown risks, uncertainties and other factors, many of which are beyond our control, and which may cause actual results or performance of companies featured to differ materially from those expressed in the statements contained in this article. S3 cannot and does not give any assurance that the results or performance expressed or implied by any forward-looking statements contained in this article will actually occur and readers are cautioned not to put undue reliance on forward-looking statements.
This article may include references to our past investing performance. Past performance is not a reliable indicator of our future investing performance.