Next Investors logo grey

Massive nickel sulphides at the Saints nickel project

|

Published 24-FEB-2022 12:06 P.M.

|

36.0 seconds read


On Thursday AOU announced that it had made two massive sulphide intersections at its Saints nickel project.

The 7 hole diamond drilling program is mostly being done so that ARN can upgrade its 1.02mt @2% nickel JORC resource. The drilling is mostly infill so the intersection of massive sulphides was somewhat expected by the market.

We are more interested in the grades of the intercepts as opposed to the massive sulphide intercepts themselves, if the drilling was targeting a new discovery then we suspect the market would have reacted a lot differently.

With 3.01m in massive sulphides intersected in one hole and 0.84m in another, all eyes are now on the nickel grades that come back from the drilling program, before AOU can try upgrading the JORC resource.